<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Sound Consulting &#187; Steinway&amp;Sons</title>
	<atom:link href="http://www.sound-consulting.com.ua/uk/?feed=rss2&#038;tag=steinwaysons" rel="self" type="application/rss+xml" />
	<link>http://www.sound-consulting.com.ua/uk</link>
	<description>Sound Systems Design</description>
	<lastBuildDate>Thu, 18 Jul 2024 07:01:59 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Musychi Studio А, near Kyiv</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1721</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1721#comments</comments>
		<pubDate>Mon, 20 Mar 2017 20:05:42 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Musychi]]></category>
		<category><![CDATA[Steinway&Sons]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1721</guid>
		<description><![CDATA[Construction of recording studio Muzychi (near Kyiv) is practically completed. The next step – decorative finishing.
We have to make a break for one or two months, as the building, which houses the studio, needs completion; existing dirt and dust do not allow us the opportunity to begin the final phase of work.
In the meantime, we&#8217;ve finished to [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7490.jpg"><img class="alignright size-medium wp-image-1722" title="DSCN7490" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7490-300x225.jpg" alt="" width="300" height="225" /></a><span style="color: #333333;">Construction of recording studio Muzychi (near Kyiv) is practically completed. The next step – decorative finishing.<br />
We have to make a break for one or two months, as the building, which houses the studio, needs completion; existing dirt and dust do not allow us the opportunity to begin the final phase of work.</span></p>
<p><span style="color: #333333;">In the meantime, we&#8217;ve finished to install and adjust RA239 &#8211; high-definition monitor system with extended cabinets.</span></p>
<p><span style="color: #333333;">The studio has beautiful acoustics and excellent sound insulation. It is assumed that this studio will specialize in classical music recording. The owner of the studio has already purchased a large grand piano Steinway&amp;Sons, which was made by his order. This is the second studio in Musychi. The <a href="http://www.sound-consulting.com.ua/uk/?page_id=163">first</a> &#8211; more little &#8211; was built in 2009.</span></p>
<p><span style="color: #333333;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7520.jpg"><img class="alignright size-medium wp-image-1725" title="DSCN7520" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7520-300x224.jpg" alt="" width="300" height="224" /></a>Acoustic design – Alexander Kravchenko. Engineer - Oleg Naumenko.</span></p>
<p><span style="color: #333333;">In the meantime, we&#8217;ll put some photos in the Portfolio.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1721&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1721</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
