<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Sound Consulting &#187; monitor system</title>
	<atom:link href="http://www.sound-consulting.com.ua/uk/?feed=rss2&#038;tag=monitor-system" rel="self" type="application/rss+xml" />
	<link>http://www.sound-consulting.com.ua/uk</link>
	<description>Sound Systems Design</description>
	<lastBuildDate>Thu, 18 Jul 2024 07:01:59 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Monitor system has been installed</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1684</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1684#comments</comments>
		<pubDate>Wed, 29 Feb 2012 21:18:20 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[acoustic design]]></category>
		<category><![CDATA[control room]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[recording space]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1684</guid>
		<description><![CDATA[RA239 monitor system has been installed in a recording studio (Zhovty Vody, Dnipropetrovsk, Ukraine), so construction of the studio has been finished.
Acoustic design &#8211; Alexander Kravchenko. Installing and adjustment of monitor system &#8211; Oleg Naumenko and Alexander Kravchenko. The owner of the studio &#8211; Meshcheryakov George.
The studio has control room and neutral acoustic room for recording.
]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/02/IMG_4964.jpg"><img class="alignright size-medium wp-image-1685" title="IMG_4964" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/02/IMG_4964-300x200.jpg" alt="" width="300" height="200" /></a><span style="color: #333333;">RA239 monitor system has been installed in a recording studio (Zhovty Vody, Dnipropetrovsk, Ukraine), so construction of the studio has been finished.</span></p>
<p><span style="color: #333333;">Acoustic design &#8211; Alexander Kravchenko. Installing and adjustment of monitor system &#8211; Oleg Naumenko and Alexander Kravchenko. The owner of the studio &#8211; Meshcheryakov George.</span></p>
<p><span style="color: #333333;">The studio has control room and neutral acoustic room for recording.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1684&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1684</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>What size of rooms are most suitable for control room?</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=177</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=177#comments</comments>
		<pubDate>Sun, 16 Aug 2009 23:21:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[something else...]]></category>
		<category><![CDATA[ceiling]]></category>
		<category><![CDATA[control room]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[square]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/wordpress/?p=177</guid>
		<description><![CDATA[If we are talking about a stereo control room, the most optimal are the premises from 30 to 50 square meters. Smaller rooms are more difficult to design and harder to achieve a desired result, especially in controlling of low frequencies. In areas larger than 50 square meters we can meet up with other problems. [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;"><span style="color: #333333;">If we are talking about a stereo control room, the most optimal are the premises from 30 to 50 square meters. Smaller rooms are more difficult to design and harder to achieve a desired result, especially in controlling of low frequencies. In areas larger than 50 square meters we can meet up with other problems. In any case &#8211; no matter how big the room is &#8211; the distance from the listening position to the monitors can not be more than five meters.</span></span></p>
<p><span style="color: #333333;">Ceiling height in the future control room can not be less than three meters. In this case &#8211; after finishing works -resulting ceiling height can be approximately 215cm. The best choices are the premises with a ceiling height of 4-5 meters or higher. Width of control room can be more than 450sm, depth &#8211; more than 300 cm. Location window and door openings also affects the decision. The abovementioned figures are approximate and rather minimal. They are shown without insulation, otherwise they should be more.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=177&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=177</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Why do you prefer to use in your studios Reflexion Arts monitors?</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=166</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=166#comments</comments>
		<pubDate>Mon, 16 Feb 2009 23:12:46 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[something else...]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[Newell]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/wordpress/?p=166</guid>
		<description><![CDATA[First, in my opinion, because it is the best monitors in the world not only in sound, but also on their performance characteristics. Of course, one could argue that the assessment of monitors is more subjective category . Then I will not argue. But there are objective factors which can not argue. For example, somebody might prefer cameras Kodak, and someone [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;">First, in my opinion, because it is the best monitors in the world not only in sound, but also on their performance characteristics. Of course, one could argue that the assessment of monitors is more subjective category . Then I will not argue. But there are objective factors which can not argue. For example, somebody might prefer cameras Kodak, and someone else, for example, Nikon. This is a matter of taste. However, any camera with 17 megapixels resolution is always better than camera with 2 megapixels resolution.<br />
Secondly, the use of Newell&#8217;s monitors is profitable. If you compare their cost with the cost of similar monitors from different manufacturers, Reflexion Arts monitors allows the user to save about $25000 and more.<br />
So our choice of these monitors is not a tribute to advertising or friendship. We managed only common sense and the desire to achieve maximum results.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=166&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=166</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Recording studio, Moldova</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=104</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=104#comments</comments>
		<pubDate>Fri, 28 Mar 2008 22:32:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[ceiling]]></category>
		<category><![CDATA[Moldova]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[Reflexion Arts]]></category>
		<category><![CDATA[square]]></category>
		<category><![CDATA[studio]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/wordpress/?p=104</guid>
		<description><![CDATA[It starts with the design studio in Anenii Noi, Moldova. The studio will be located in a separate building. The area of the future studio is about 50 square meters, ceiling height &#8211; about 4 meters. The studio will consist of a control and vocal rooms. Presumably, the design work will need up to two months. Author [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;"><span style="color: #333333;">It starts with the design studio in Anenii Noi, Moldova. The studio will be located in a separate building. The area of the future studio is about 50 square meters, ceiling height &#8211; about 4 meters. The studio will consist of a control and vocal rooms. Presumably, the design work will need up to two months. Author of the project and process engineer &#8211; Oleg Naumenko. Reflexion Arts 239 monitors will be install in the studio. It will the first monitor system designed by Philip Newell in Moldova.</span></span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=104&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=104</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Recording studio Maxi Sound, Kyiv</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=98</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=98#comments</comments>
		<pubDate>Sun, 07 Oct 2007 22:24:55 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[control room]]></category>
		<category><![CDATA[Maxi Sound]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[recording space]]></category>
		<category><![CDATA[Reflexion Arts]]></category>
		<category><![CDATA[square]]></category>
		<category><![CDATA[studio]]></category>
		<category><![CDATA[switching]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/wordpress/?p=98</guid>
		<description><![CDATA[ 
Installation of the monitor system Reflexion Arts 239 completed construction of the recording studio Maxi Sound, which is located at Obolon in Kyiv. The studio contains a control room (30 square meters), recording space with a neutral acoustics, vocal room, arranger, service and office space. Project author &#8211; Alexander Kravchenko. Engineering and technology &#8211; [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;"> </span></p>
<div id="attachment_1011" class="wp-caption alignleft" style="width: 310px"><a href="http://www.sound-consulting.net/pl/wp-content/uploads/2007/10/DSCN2534.jpg"><img class="size-medium wp-image-1011   " title="DSCN2534" src="http://www.sound-consulting.net/pl/wp-content/uploads/2007/10/DSCN2534-300x225.jpg" alt="" width="300" height="225" /></a><p class="wp-caption-text">Maxi Sound, Obolon, Kyiv</p></div>
<p><span style="color: #333333;"><span style="color: #333333;">Installation of the monitor system Reflexion Arts 239 completed construction of the recording studio Maxi Sound, which is located at Obolon in Kyiv. The studio contains a control room (30 square meters), recording space with a neutral acoustics, vocal room, arranger, service and office space. Project author &#8211; Alexander Kravchenko. Engineering and technology &#8211; Victor Verhnyatsky. Switching and installation of monitors &#8211; Oleg Naumenko and Alexander Kravchenko.</span></span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=98&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=98</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sergei Bolshakov&#8217;s recording studio &#8220;Parametrica&#8221;</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1139</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1139#comments</comments>
		<pubDate>Fri, 28 Apr 2006 20:32:18 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Bolshakov]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[Newell]]></category>
		<category><![CDATA[Reflexion Arts]]></category>
		<category><![CDATA[Наше время]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/wordpress/?p=1139</guid>
		<description><![CDATA[ Sergei Bolshakov&#8217;s recording studio &#8220;Parametrica&#8221; is one of the most successful studios in Russia. It specializes in live music recording. The studio is located in the centre of Moscow (Taganka), in the basement of a building. Reflexion Arts 239 monitors, which are installed in the studio, are the first monitor system in Moscow, designed by [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;"><span style="color: #333333;"><img class="ngg-singlepic ngg-left" src="http://www.sound-consulting.net/pl/wp-content/gallery/nashe-vremja/61.jpg" alt="61" width="288" height="216" /> <span style="color: #333333;">Sergei Bolshakov&#8217;s recording studio &#8220;Parametrica&#8221; is one of the most successful studios in Russia. It specializes in live music recording. The studio is located in the centre of Moscow (Taganka), in the basement of a building. Reflexion Arts 239 monitors, which are installed in the studio, are the first monitor system in Moscow, designed by Philip Newell. Studio contains a control room, three rooms for recording, machine room, rest rooms, etc. The author of the project and process engineer &#8211; Alexander Kravchenko. Monitor system installation &#8211; Oleg Naumenko and Alexander Kravchenko. Owner of the studio &#8211; Sergei Bolshakov.</span></span></span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1139&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1139</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
