<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Sound Consulting</title>
	<atom:link href="http://www.sound-consulting.com.ua/uk/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://www.sound-consulting.com.ua/uk</link>
	<description>Sound Systems Design</description>
	<lastBuildDate>Thu, 18 Jul 2024 07:01:59 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>KANVA Studio</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1734</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1734#comments</comments>
		<pubDate>Thu, 18 Jul 2024 06:59:26 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[design]]></category>
		<category><![CDATA[Kanva]]></category>
		<category><![CDATA[RA239]]></category>
		<category><![CDATA[studio]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.com.ua/uk/?p=1734</guid>
		<description><![CDATA[This studio in our portfolio is special. It was clear from the very beginning that there was an opportunity to create something unique.
&#8212;&#8211; VIDEO KANVA GUIDE &#8212;&#8211;
Of course, studios are always created within certain limits. But if we ignore the minor architectural and design restrictions inherent in any project, then in everything else I was [...]]]></description>
			<content:encoded><![CDATA[<p>This studio in our portfolio is special. It was clear from the very beginning that there was an opportunity to create something unique.</p>
<p style="text-align: center;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/Video-KANVA1.mov">&#8212;&#8211; VIDEO KANVA GUIDE &#8212;&#8211;</a></p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/01-IMG_8174.jpeg"><img class="aligncenter size-medium wp-image-1735" title="01 IMG_8174" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/01-IMG_8174-300x225.jpg" alt="" width="300" height="225" /></a>Of course, studios are always created within certain limits. But if we ignore the minor architectural and design restrictions inherent in any project, then in everything else I was free: in design, in the use of the latest technologies, in choosing a team, in innovation, design and much more. I also wanted to reconsider some existing stereotypes.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/02-IMG_8497.jpeg"><img class="aligncenter size-medium wp-image-1736" title="02 IMG_8497" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/02-IMG_8497-300x225.jpg" alt="" width="300" height="225" /></a>The future studio was located on Podol in Kyiv, on the third floor of a new monolithic frame house. The building&#8217;s design gave us flexibility in the interior layout. The total area of ​​the complex, including office space and reception, was approximately 140 sq.m., and the ceiling height was 340 cm. The room had access to a large terrace overlooking Kyiv Vozdvizhenka. There was also a separate exit to the balcony from the control room. The rooms had huge windows 3 meters high, almost from the floor.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/03-IMG_8433.jpeg"><img class="aligncenter size-medium wp-image-1737" title="03 IMG_8433" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/03-IMG_8433-300x225.jpg" alt="" width="300" height="225" /></a>What we planned to build can hardly be called just a studio. Most likely, it should have been some kind of creative laboratory and, possibly, a production agency.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/04-IMG_8554.jpeg"><img class="aligncenter size-medium wp-image-1738" title="04 IMG_8554" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/04-IMG_8554-300x225.jpg" alt="" width="300" height="225" /></a>The studio was supposed to specialize in modern &#8211; mainly electronic &#8211; music. This means that the control room must be spacious, and the monitor system must be capable of reproducing the lowest frequencies of sub-bass parts. The acoustic treatment of the room and its geometry had to provide acoustic control down to these frequencies.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/05-IMG_8676.jpeg"><img class="aligncenter size-medium wp-image-1740" title="05 IMG_8676" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/05-IMG_8676-300x225.jpg" alt="" width="300" height="225" /></a>In addition to the control room, a vocal room was also planned. This was enough to solve creative problems. In addition, it was necessary to provide for the possibility of uncompromising vocal recording directly in the control room.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/06-IMG-91681.jpg"><img class="aligncenter size-medium wp-image-1742" title="06 IMG-9168" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/06-IMG-91681-e1721284740757-300x225.jpg" alt="" width="300" height="225" /></a>Thus, we agreed that out of the total area of ​​the room, about 50 sq.m. were allocated to the control room, and about 15 sq.m. to the vocal room. It was also necessary to preserve the existing windows as much as possible.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/07-IMG-9200.jpg"><img class="aligncenter size-medium wp-image-1743" title="07 IMG-9200" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/07-IMG-9200-e1721284782543-300x225.jpg" alt="" width="300" height="225" /></a>Before the design began, we decided on monitors. The customer already had Focal Trio 11 near/mid-field monitors. And the far-field system was a selected stereo pair of Reflexion Arts 239X monitors. The design and configuration of this system took place simultaneously with the construction of the front wall.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/08-IMG_9757-1.jpeg"><img class="aligncenter size-medium wp-image-1744" title="08 IMG_9757 (1)" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/08-IMG_9757-1-300x225.jpg" alt="" width="300" height="225" /></a></p>
<p>A month and a half later, the project was ready.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/09-IMG_9891.jpeg"><img class="aligncenter size-medium wp-image-1745" title="09 IMG_9891" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/09-IMG_9891-300x225.jpg" alt="" width="300" height="225" /></a>First of all, it was necessary to think about sound insulation, because this was a residential building. For this purpose, “floating” partitions were used and, with the permission of the civil engineers, a multi-layer “floating” floor weighing about 8 tons and about 18 cm thick.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/10-IMG_0089-1.jpeg"><img class="aligncenter size-medium wp-image-1746" title="10 IMG_0089 (1)" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/10-IMG_0089-1-300x225.jpg" alt="" width="300" height="225" /></a>During the construction of the acoustic shell, specific parts were required using a CNC machine. This is how we met Alexander Kozachenko, who was not only an operator of such a machine, but also an interior designer. Together with our designer Maria Isaenko, they offered very interesting creative ideas.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/11-IMG_9134-1.jpeg"><img class="aligncenter size-medium wp-image-1747" title="11 IMG_9134 (1)" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/11-IMG_9134-1-300x225.jpg" alt="" width="300" height="225" /></a>The front wall contained 15 layers of different materials, and its front part was composed of numbered plywood blanks. The main monitor system was part of this wall, and the bezels were painted in its color. The large studio window did not look out into the vocal room, as is often the case, but outward, with a view of Vozdvizhenka.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/12-IMG_9306.jpeg"><img class="aligncenter size-medium wp-image-1748" title="12 IMG_9306" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/12-IMG_9306-300x225.jpg" alt="" width="300" height="225" /></a>In the first half of the day, the front wall was on the sunny side of the building and the window became very hot, as a result of which the inner glass fogged up, and it was not water vapor, but something similar to perspiration with fatty deposits. We tried a variety of ideas, and each time it was necessary to remove the internal inclined glass weighing about 200 kilograms.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/13-IMG_99059.jpeg"><img class="aligncenter size-medium wp-image-1749" title="13 IMG_99059" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/13-IMG_99059-300x225.jpg" alt="" width="300" height="225" /></a>As a result, it was decided to make a certain compromise and make a slotted ventilation gap between the glass and the window frame. The remote-controlled roller blind inside the window also helped partly, especially when working before lunch.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/05-IMG-9090.jpg"><img class="aligncenter size-medium wp-image-1750" title="05 IMG-9090" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/05-IMG-9090-e1721285186888-300x225.jpg" alt="" width="300" height="225" /></a>Sloped ceiling traps were designed to combat flutter rather than low frequency absorption. In addition, measurements and practical experience in constructing similar rooms pointed out to us their lack of efficiency given the relatively high costs of their manufacture and hanging.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/14-IMG_0355.jpeg"><img class="aligncenter size-medium wp-image-1751" title="14 IMG_0355" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/14-IMG_0355-300x225.jpg" alt="" width="300" height="225" /></a>The back wall traditionally consisted of low-frequency traps and was designed to leave room for an exit to the balcony.</p>
<p>The window sills on the side walls were deep enough to turn them into cozy armchairs.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/15-IMG_0321.jpeg"><img class="aligncenter size-medium wp-image-1752" title="15 IMG_0321" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/15-IMG_0321-300x225.jpg" alt="" width="300" height="225" /></a>The studio table is a different story. The availability of a CNC machine provoked the desire to make something unique, different, different. The wishes were as follows:</p>
<p>- impact on acoustics and monitoring conditions is minimal;</p>
<p>- material – natural solid ash (not chipboard or MDF) 40 and 20 mm thick;</p>
<p>- cables, power supplies (18 pcs.) and other switching are hidden;</p>
<p>- fasteners – be hidden;</p>
<p>- SSL controllers – must be located on a separate movable section of the tabletop, and when moving it should not touch the computer keyboard and the skin of the armrests;</p>
<p>- equipment must be ventilated, etc.</p>
<p>3-D modeling in Fusion 360 helped in solving these problems.</p>
<p style="text-align: right;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/2425296066101874915-1.mp4">&#8212;&#8211; STUDIO TABLE MOVEMENT &#8212;&#8211;</a></p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/2425296066101874915-1.mp4"></a>The table turned out to be comfortable, ergonomic, beautiful, although not cheap.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/16-IMG_0325.jpeg"><img class="aligncenter size-medium wp-image-1753" title="16 IMG_0325" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/16-IMG_0325-300x225.jpg" alt="" width="300" height="225" /></a>Finally…</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/17-IMG_0329.jpeg"><img class="aligncenter size-medium wp-image-1754" title="17 IMG_0329" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/17-IMG_0329-300x225.jpg" alt="" width="300" height="225" /></a>The floor covering is made of wear-resistant vinyl.</p>
<p>Climate control &#8211; an autonomous ventilation system plus an almost silent Mitsubishi ducted air conditioner, controlled via Wi-Fi.</p>
<p>The video monitor is panoramic with a swivel mount to the studio table.</p>
<p>Video projector. The back wall is a retractable screen with PU.</p>
<p>Retractable system for the movable section of the tabletop &#8211; GRASS Movement Systems.</p>
<p>Studio microphone and keyboard stands are available upon request.</p>
<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/18-IMG_0332.jpeg"><img class="aligncenter size-medium wp-image-1755" title="18 IMG_0332" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/18-IMG_0332-300x225.jpg" alt="" width="300" height="225" /></a>And most importantly&#8230;</p>
<p>This work gave us all pleasure, and the monitoring, acoustic features of the studio and its design pleasantly surprised many of my colleagues, even from European countries.</p>
<p style="text-align: center;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/Video-KANVA.mov">&#8212;&#8211; VIDEO KANVA GUIDE &#8212;&#8211;</a></p>
<p>What do you wish for the studio? The same as for all of us: victory and peace.</p>
<p><strong><span style="font-size: small;"><span style="color: #800080;">Glory to Ukraine!  Слава Україні!</span></span></strong></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1734&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1734</wfw:commentRss>
		<slash:comments>0</slash:comments>
<enclosure url="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/Video-KANVA1.mov" length="19569426" type="video/quicktime" />
<enclosure url="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/Video-KANVA.mov" length="19569426" type="video/quicktime" />
<enclosure url="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2024/07/2425296066101874915-1.mp4" length="2767395" type="video/mp4" />
		</item>
		<item>
		<title>Musychi Studio А, near Kyiv</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1721</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1721#comments</comments>
		<pubDate>Mon, 20 Mar 2017 20:05:42 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Musychi]]></category>
		<category><![CDATA[Steinway&Sons]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1721</guid>
		<description><![CDATA[Construction of recording studio Muzychi (near Kyiv) is practically completed. The next step – decorative finishing.
We have to make a break for one or two months, as the building, which houses the studio, needs completion; existing dirt and dust do not allow us the opportunity to begin the final phase of work.
In the meantime, we&#8217;ve finished to [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7490.jpg"><img class="alignright size-medium wp-image-1722" title="DSCN7490" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7490-300x225.jpg" alt="" width="300" height="225" /></a><span style="color: #333333;">Construction of recording studio Muzychi (near Kyiv) is practically completed. The next step – decorative finishing.<br />
We have to make a break for one or two months, as the building, which houses the studio, needs completion; existing dirt and dust do not allow us the opportunity to begin the final phase of work.</span></p>
<p><span style="color: #333333;">In the meantime, we&#8217;ve finished to install and adjust RA239 &#8211; high-definition monitor system with extended cabinets.</span></p>
<p><span style="color: #333333;">The studio has beautiful acoustics and excellent sound insulation. It is assumed that this studio will specialize in classical music recording. The owner of the studio has already purchased a large grand piano Steinway&amp;Sons, which was made by his order. This is the second studio in Musychi. The <a href="http://www.sound-consulting.com.ua/uk/?page_id=163">first</a> &#8211; more little &#8211; was built in 2009.</span></p>
<p><span style="color: #333333;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7520.jpg"><img class="alignright size-medium wp-image-1725" title="DSCN7520" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN7520-300x224.jpg" alt="" width="300" height="224" /></a>Acoustic design – Alexander Kravchenko. Engineer - Oleg Naumenko.</span></p>
<p><span style="color: #333333;">In the meantime, we&#8217;ll put some photos in the Portfolio.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1721&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1721</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Electronic music. Artreform</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1713</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1713#comments</comments>
		<pubDate>Mon, 19 Oct 2015 19:18:31 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Artreform]]></category>
		<category><![CDATA[Joss]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1713</guid>
		<description><![CDATA[Once we were invited to a meeting. The topic of the meeting was unusual: studio furniture. Our interlocutors were musicians who perform electronic music. The specificity of such creativity lies in the fact that near you there are always a lot of keyboards, samplers, sound modules, synthesizers and so on. Our interlocutors were already tired [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/10356257_873487099328245_4307362644779875481_n.jpg"><img class="alignright size-medium wp-image-1714" title="10356257_873487099328245_4307362644779875481_n" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/10356257_873487099328245_4307362644779875481_n-300x225.jpg" alt="" width="300" height="225" /></a>Once we were invited to a meeting. The topic of the meeting was unusual: studio furniture. Our interlocutors were musicians who perform electronic music. The specificity of such creativity lies in the fact that near you there are always a lot of keyboards, samplers, sound modules, synthesizers and so on. Our interlocutors were already tired of this mess and wanted to change something.</span></p>
<p><span style="color: #333333;">These musicians were engaged in creativity in a small unsuitable room on the first floor. The height of the ceiling was about 280 cm, and the panels between the floors (as we learned later) were wooden, because it was an old building.</span></p>
<p><span style="color: #333333;">We pointed out the musicians to the problems of their premises. During the conversation it turned out that they did not know that we design recording studios. They agreed with our proposals, but they need took some time to agree on the budget. We told them that in <a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2015/10/IMG_9552.jpg"><img class="alignright size-medium wp-image-1717" title="IMG_9552" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2015/10/IMG_9552-300x200.jpg" alt="" width="300" height="200" /></a>these conditions nobody can talk about a full-fledged studio, but we can help them to do everything in this room that the laws of physics allow.</span></p>
<p><span style="color: #333333;">Projecting furniture is a very interesting activity, and in this case we had an opportunity to realize our ideas about studio furniture.</span></p>
<p><span style="color: #333333;">Three months later, everything changed. The studio table turned out to be functional, ergonomic and very beautiful. The room was very comfortable. Quantity of microphone cables became smaller at times. In addition, we managed to significantly improve the sound insulation.</span></p>
<p><span style="color: #333333;"> Acoustic and furniture design – Alexander Kravchenko. Interior design – Maria Movchan.</span></p>
<p><span style="color: #333333;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2015/10/IMG_9577.jpg"><img class="alignright size-medium wp-image-1719" title="IMG_9577" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2015/10/IMG_9577-300x200.jpg" alt="" width="300" height="200" /></a>More information -</span> <a href="https://www.facebook.com/ArtreformRecords/?fref=ts">here</a> <span style="background-color: #ffffff;"><span style="color: #333333;">and</span></span> <a href="https://www.facebook.com/pg/kravchenkosoundconsulting/videos/?ref=page_internal">here</a></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1713&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1713</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Poltava</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1709</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1709#comments</comments>
		<pubDate>Sat, 03 Nov 2012 17:35:24 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Poltava]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1709</guid>
		<description><![CDATA[We have finished our work in Poltava. It took four days only to install RA239 monitor system and to finish wiring. 
The construction of the studio carried out under the supervision of engineer Victor Verhnyatskiy. 
Acoustic designer – Alexander Kravchenko. Engineer - Oleg Naumenko.

]]></description>
			<content:encoded><![CDATA[<div id="_mcePaste"><span style="color: #333333;"><span style="font-size: small;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN6378.jpg"><img class="alignleft size-medium wp-image-1710" title="DSCN6378" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN6378-300x225.jpg" alt="" width="300" height="225" /></a>We have finished our work in Poltava. It took four days only to install RA239 monitor system and to finish wiring. </span></span></div>
<div id="_mcePaste"><span style="color: #333333;"><span style="font-size: small;">The construction of the studio carried out under the supervision of engineer Victor Verhnyatskiy. </span></span></div>
<div><span style="color: #333333; font-size: 12px;"><span style="color: #333333;"><span style="font-size: small;">Acoustic designer – Alexander Kravchenko. Engineer - Oleg Naumenko.</span></span></span></div>
<div></div>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1709&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1709</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Project-studio in Astana, Kazakhstan</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1697</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1697#comments</comments>
		<pubDate>Mon, 08 Oct 2012 17:20:58 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Astana]]></category>
		<category><![CDATA[studio]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1697</guid>
		<description><![CDATA[The construction of this small studio was completed six months ago. From the first days of our communication, the customer was not going to build any studio. He wanted us to construct him a booth for vocals and announcers recording. First we spent some time to explain to the customer our point of view on [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/7.jpg"><img class="alignleft size-medium wp-image-1698" title="7" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/7-300x200.jpg" alt="" width="300" height="200" /></a><span style="color: #333333;">The construction of this small studio was completed six months ago. From the first days of our communication, the customer was not going to build any studio. He wanted us to construct him a booth for vocals and announcers recording. First we spent some time to explain to the customer our point of view on such things, to explain all the strengths and weaknesses. Then we spent some time on establishing communication and solving bureaucratic problems&#8230;</span></p>
<p><span style="color: #333333;">The studio was built very quickly, because there was constantly one of our engineers during the construction.</span></p>
<p><span style="color: #333333;"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/10/IMG_3075.jpg"><img class="alignright size-medium wp-image-1701" title="IMG_3075" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/10/IMG_3075-300x225.jpg" alt="" width="300" height="225" /></a>Almost six months has passed. During this time more than 180 people were recorded! No one expected that the studio would become so popular!</span></p>
<p><span style="color: #333333;">And recently we’ve received such a letter.</span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Our research team is engaged in the study of Kazakh speech, so it was extremely important for us to have our own room or a recording booth in which it will be possible to continuously collect high-quality acoustic data. I think that we were incredibly lucky with the company Sound Consulting, which made such small and remote project as ours. And we are very happy that instead of a small cabin, we got a full-fledged sound recording studio! The studio is excellent, <a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/10/IMG_3084.jpg"><img class="alignright size-medium wp-image-1703" title="IMG_3084" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/10/IMG_3084-300x225.jpg" alt="" width="300" height="225" /></a>exceeding all our expectations for noise insulation and technical equipment. We were convinced in this once again, when we started recording, although at that time noisy construction and installation works were carried out in the university building. The recording quality is flawless! Since the completion of the studio we have already recorded more than 170 people, including professional actors, announcers and leading local TV channels. I note that it&#8217;s a pleasure to work in such a studio!</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Separately, I would like to thank Alexander Kravchenko for his unique project and for not leaving us at the most difficult moment. I was very pleased to work with such professionals as Alexander and Valery, who really do their work.</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Thank you, guys! I wish you further creative success!</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Zhandos Esenbaev</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Researcher</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Nazarbayev University</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Research and Innovation System</span></em></span></p>
<p><span style="color: #993300;"><em><span style="font-size: small;">Astana, Kazakhstan</span></em></span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1697&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1697</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Recording Studio in Poltava</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1693</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1693#comments</comments>
		<pubDate>Sat, 15 Sep 2012 14:23:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[Poltava]]></category>
		<category><![CDATA[RA239]]></category>
		<category><![CDATA[studio]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1693</guid>
		<description><![CDATA[We have completed the construction of the recording studio in Poltava. The studio consists of vocal and control rooms. There is also a lounge and office space, which is being finishing work.
During the construction of the studio we used new materials for soundproofing and acoustic control.
The construction of the studio carried out under the supervision [...]]]></description>
			<content:encoded><![CDATA[<div id="_mcePaste"><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN6359.jpg"><img class="alignleft size-medium wp-image-1694" title="DSCN6359" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2017/03/DSCN6359-300x225.jpg" alt="" width="300" height="225" /></a><span style="color: #333333;">We have completed the construction of the recording studio in Poltava. The studio consists of vocal and control rooms. There is also a lounge and office space, which is being finishing work.</span></div>
<div id="_mcePaste"><span style="color: #333333;">During the construction of the studio we used new materials for soundproofing and acoustic control.</span></div>
<div id="_mcePaste"><span style="color: #333333;">The construction of the studio carried out under the supervision of engineer Victor Verhnyatskiy.</span></div>
<div id="_mcePaste"><span style="color: #333333;">We have made also wiring and installed equipment: monitor system RA239, console SSL AWS924, recording system ProTools HDX, processors Eventide H8000FW and Lexicon PCM92&amp;96, converters Apogee Symphony, tube outboard, etc.</span></div>
<div id="_mcePaste"><span style="color: #333333;">We are going to finish the studio completely till November 2012.</span></div>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1693&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1693</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Monitor system has been installed</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1684</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1684#comments</comments>
		<pubDate>Wed, 29 Feb 2012 21:18:20 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>
		<category><![CDATA[acoustic design]]></category>
		<category><![CDATA[control room]]></category>
		<category><![CDATA[monitor system]]></category>
		<category><![CDATA[recording space]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1684</guid>
		<description><![CDATA[RA239 monitor system has been installed in a recording studio (Zhovty Vody, Dnipropetrovsk, Ukraine), so construction of the studio has been finished.
Acoustic design &#8211; Alexander Kravchenko. Installing and adjustment of monitor system &#8211; Oleg Naumenko and Alexander Kravchenko. The owner of the studio &#8211; Meshcheryakov George.
The studio has control room and neutral acoustic room for recording.
]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/02/IMG_4964.jpg"><img class="alignright size-medium wp-image-1685" title="IMG_4964" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2012/02/IMG_4964-300x200.jpg" alt="" width="300" height="200" /></a><span style="color: #333333;">RA239 monitor system has been installed in a recording studio (Zhovty Vody, Dnipropetrovsk, Ukraine), so construction of the studio has been finished.</span></p>
<p><span style="color: #333333;">Acoustic design &#8211; Alexander Kravchenko. Installing and adjustment of monitor system &#8211; Oleg Naumenko and Alexander Kravchenko. The owner of the studio &#8211; Meshcheryakov George.</span></p>
<p><span style="color: #333333;">The studio has control room and neutral acoustic room for recording.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1684&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1684</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sky Recording Studio</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1668</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1668#comments</comments>
		<pubDate>Fri, 26 Aug 2011 17:19:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1668</guid>
		<description><![CDATA[Construction of Sky Recording Studio in Almaty, Kazakhstan, is finished. The main monitor system will be installed in 2012.
Acoustic designer &#8211; Alexander Kravchenko. The owner of the studio &#8211; Alexander Shevchenko.
Construction of the studio has several features.
Firstly, it will the first RA234 monitor system installed RA234 in the CIS!
Secondly, the studio has built in the shortest [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2011/11/IMG_5317.jpg"><img class="alignleft size-medium wp-image-1669" title="IMG_5317" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2011/11/IMG_5317-300x200.jpg" alt="" width="300" height="200" /></a><span style="color: #333333;">Construction of</span> <a href="http://skyrecording.kz/" target="_blank">Sky Recording</a> <span style="color: #333333;">Studio in Almaty, Kazakhstan, is finished. The main monitor system will be installed in 2012.</span></p>
<p><span style="color: #333333;">Acoustic designer &#8211; Alexander Kravchenko. The owner of the studio &#8211; Alexander Shevchenko.</span></p>
<p><span style="color: #333333;">Construction of the studio has several features.<br />
Firstly, it will the first RA234 monitor system installed RA234 in the CIS!<br />
Secondly, the studio has built in the shortest record time &#8211; almost a month and a half!<br />
Thirdly, Alexander Shevchenko (the owner) is one of the judges of popular TV-show &#8220;X-Factor&#8221; in Kazakhstan; it guaranteed popularity of the studio and interest to its construction.</span><br />
<a href="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2011/08/IMG_5341.jpg"><img class="size-medium wp-image-1671 alignright" title="IMG_5341" src="http://www.sound-consulting.com.ua/uk/wp-content/uploads/2011/08/IMG_5341-300x200.jpg" alt="" width="300" height="200" /></a><span style="color: #333333;">Fourthly, the studio was built in the area of ​​seismic activity.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1668&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1668</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Recording studio in Zhovty Vody is finished</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1664</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1664#comments</comments>
		<pubDate>Fri, 05 Aug 2011 14:22:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1664</guid>
		<description><![CDATA[Construction of the recording studio in Zhovty Vody (Ukraine) is finished. In November 2011 we will install and tune RA239 monitor system. This is the first RA monitor system in this region of Ukraine.
Acoustic designer &#8211; Alexander Kravchenko. Owner of the studio - George Meshcheryakov.
]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;">Construction of the recording studio in Zhovty Vody (Ukraine) is finished. In November 2011 we will install and tune RA239 monitor system. This is the first RA monitor system in this region of Ukraine.</span></p>
<p><span style="color: #333333;">Acoustic designer &#8211; Alexander Kravchenko. Owner of the studio - George Meshcheryakov.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1664&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1664</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Recording studio in Zhovti Vody, Ukraine</title>
		<link>http://www.sound-consulting.com.ua/uk/?p=1655</link>
		<comments>http://www.sound-consulting.com.ua/uk/?p=1655#comments</comments>
		<pubDate>Wed, 02 Feb 2011 12:45:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://www.sound-consulting.net/uk/?p=1655</guid>
		<description><![CDATA[We agree to build a recording studio in Zhovti Vody, Dnepropetrovsk region, Ukraine. The studio will consist of a control room and a small hall for recording with neutral acoustics. Owner of the studio are going to expand the studio with additional hall with &#8220;live&#8221; or variable acoustic. Previous specialization studio - rock and pop recording.
We will install RA239 monitor system.
Approximately studio construction will begin in late April 2011.
]]></description>
			<content:encoded><![CDATA[<p><span style="color: #333333;">We agree to build a recording studio in Zhovti Vody, Dnepropetrovsk region, Ukraine. The studio will consist of a control room and a small hall for recording with neutral acoustics. Owner of the studio are going to expand the studio with additional hall with &#8220;live&#8221; or variable acoustic. Previous specialization studio - rock and pop recording.</span></p>
<p><span style="color: #333333;">We will install RA239 monitor system.</span></p>
<p><span style="color: #333333;">Approximately studio construction will begin in late April 2011.</span></p>
<img src="http://www.sound-consulting.com.ua/uk/?ak_action=api_record_view&id=1655&type=feed" alt="" />]]></content:encoded>
			<wfw:commentRss>http://www.sound-consulting.com.ua/uk/?feed=rss2&amp;p=1655</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
